public project development (on-going)

S/N NAME OF PROJECT & LOCATION WORK DESCRIPTION CLIENT NAME
1. Temporary Infrastructure Works to Support Changi East 1) Design and Build of minor buildings, checkpoint facilities, haulage road, drainage civil engineering external works, M&E works-street lightings, CCTV, 800mm water pipes. Development
2) Operation and Maintenance of checkpoint facilities, constructed road, drainage, M&E works
Changi Airport Group
2. Proposed Construction of Roads, Drains, Sewer & Earthworks at Gambas Way & Gambas Link Civil Works, Road, Drainage, 5.5m and 6m wide Canal and Sewer Works Jurong Town Corporation
3. Earthworks, Demolition and Associated Works for Pasir Ris Wafer Fabrication Park at Pasir Ris Industrial Drive 1 and Loyang Crescent Earthworks, Demolition and Associated Works Jurong Town Corporation
4. Earthworks at Lim Chu Kang area Earthworks, Contiguous Bored Pile, Drain works, M&E works, Wildlife Management & Monitoring Plan (WMMP) LTA
5. Excavation, Transportation, Loading and Filling Any Materials to designated stockpile, surcharge & Dry Fill Area at Pulau Tekong Excavation, Transportation, Loading and filling of sand Boskalis / Penta-Ocean Joint Venture
6. Construction of Road, Drain, Sewers and Ancillary Works at Tuas West Coast Roads, Drains and Sewers including Ancillary work Hyundai Engineering & Construction Co. Ltd
7. (A) Construction of Tampines ST 64, Tampines North Drive 1 and Tampines North Drive 2
Trunk Sewer in Tampines North (North-Part 2)
(C) Construction of Road-Related Facilities in Tampines North N6
Roads, Drains and Sewers including Ancillary work HDB
8. Proposed Temporary Heavy Vehicle Park (HVP) at Gali Batu Civil Works, Road and Drainage Works URBAN REDEVELOPMENT AUTHORITY
9. License of Berth Operator at Pulau Punggol Aggregate Terminal Operation and maintenance of aggregate terminal Building and Construction Authority (BCA)
10. Proposed Road Widening and Construction of Road Related Facilities along Tampines Avenue 9 Civil Works, Roads and Drainage Works Housing & Development Board
11. Appointment of Operator to Manage and Operate the Aggregate Landing Site (ALS) at Changi East Finger Operation and Maintenance of Landing Site Changi Airport Group
12.
  1. Earthworks and Slope Formation at Bukit Batok N4 (Phase 3)

  2. Widening of Bukit Batok West Avenue 2, Construction of Bukit Batok West Avenue 5 (Extension) and Bukit Batok West Avenue 8 (Part 3)

  3. Relocation of Bus Bay and Bus Shelter at Bukit Batok Road
Earthworks, Road and Drainage Works and Ancillary Works Housing & Development Board

Copyright © 2023, Huationg® Global Limited. All Rights Reserved

Huationg® Contractor Pte Ltd is not affiliated or related to Huationg Holdings Pte Ltd / Huationg Asia Pte Ltd / Huationg Inland Transport Service Pte Ltd / Huationg Industries Pte Ltd