public project development (completed)

NO. PROJECT TITLE WORK DESCRIPTION CLIENT NAME
1. Contract C421 – Kallang Paya Lebar Expressway (ECP – Nicoll Highway) Earthworks, Road Diversion Works, Road and Drainage Works Sembcorp Engineers & Constructors Pte Ltd
2. Contract 856 – Construction and Completion of West Coast, Pasir Panjang, Alexandra and Telok Blangah Station including Harbour Front Station Fit Out Works And Tunnels Earthworks Sembcorp Engineers & Constructors Pte Ltd
3. Contract 855 – Construction and Completion of Holland, Buona Vista And NUH Stations Including One-North Station Fit Out Works And Tunnels Earthworks WH-STEC-AM JV
4. Contract 486 – Reclamation, Seawall Construction & Earthworks for Marina Coastal Expressway (Marina East) Reclamation, Seawall Construction & Earthworks Samsung C&T Corporation
5. Contract 487 – Design, Construction and Completion of Marina Coastal Expressway Site Clearance, Earthworks, Road and Drainage works, Road Diversion works Daelim Industrial Co. Ltd
6. RD248 Proposed Bus Park at Woodlands Pavement Works and Ancillary Building Works Land Transport Authority
7. Contract 911 – Design and Construction of Depot for Downtown Line Earthworks, Road and Drainage works, Retaining wall, Subsoil & Sub-Ballast Civil Engineering Works Construction GS Engineering and Construction – Hock Lian Seng Infrastructure Joint Venture
8. Contract 912 – Design and Construction of Station at Bukit Panjang (Petir) and Tunnels for DTL Stage 2 Earthworks Lum Chang Building Contractors Pte Ltd
9. Contract 1685 – Tuas West MRT Extension Depot Temporary works, Site Clearance & Earthworks Jurong Primewide Pte Ltd
10. RD259 – Proposed Bus Depot at Loyang Earthworks, Civil Engineering Works and Ancillary Building Works Land Transport Authority
11. Contract T227 – Construction of Marina South Station & Tunnels for Thomson Line Traffic Diversion Works Sinohydro-Sembcorp JV
12. Contract 922 – Construction and Completion of Expo Station and Overrun Tunnel for Downtown Line Stage 3 Earthworks Samsung C&T Corporation
13. Contract 923A – Construction and Completion of Tunnels Between Tampines East Station and Upper Changi Station for Downtown Line Stage 3 Earthworks Shanghai Tunnel Engineering Co. Ltd
14. C927 – Construction and Completion of Bedok Reservoir Station and Tunnels For Downtown Line Stage 3 Temporary works, Pavement Works and Earthworks CMC Ravenna – Singapore Branch
15. Contract 931 – Construction and Completion of Macpherson Station and Associated Tunnels for Downtown Line Stage 3 Earthworks Hyundai Engineering & Construction Co. Ltd
16. Contract 1688 – Construction of Station EW30 and Viaducts for Tuas West Extension Traffic Diversions, Road & Drainage Works Shanghai Tunnel Engineering Co. Ltd
17. Site Clearance and Earthworks at Yishun Town N5 (Part) Site Clearance and Earthworks Housing & Development Board
18. Site Clearance and Earthworks at Tampines Neighbourhood 6 (Part 1) Site Clearance, Earthworks, Temporary Drainage Works Housing & Development Board
19. NEWATER Infrastructure Plan Extension (NIPE) Contract 7 – Design and Construction of 4m Diameter Segmental Tunnel with 2200mm diameter Pipeline from Raffles Country Club to Pioneer Road Shaft Excavation and Backfilling works Shimizu Corporation
20. Piling and Construction of Basement 2 Floor Slab for Proposed Jurong General Hospital and Community Hospital at Jurong East Street 21 Site Clearance, Demolition, Temporary Site Works, Drainage, Earthworks Penta Ocean Construction Co. Ltd
21. Proposed 10 Storey Community Hospital involving 2 Inpatient Tower Blocks (Total: 428 Beds) and 1 Geriatric Research Centre Towner with 2 Basements on Lot 03648W MK 19 at 100 Yishun Central (Yishun Planning Area) Earthworks Kimly-Shimizu Joint Venture
22. Proposed development of 9 storey Medical Centre cum Administrative Office with basement carparks for Changi General Hospital at Simei Street 3 (Tampines) Earthworks Kimly-Shimizu Joint Venture
23. Proposed 6/7 Storey Civic & Community/Sports & Recreation Development with2 Basements on Lot 5971T PT, 5973K PT, 6036K PT, 6037N PT & 6936W PT MK 28 at Tampines Street 82 (Tampines Planning Area) Earthworks Hexacon Construction Private Limited
24. Construction of Proposed Roads, Drains and Sewer for Defu Phase 1 Civil Works, Road, Drainage and Sewer Works Housing & Development Board
25. Site Clearance and Earthworks for Defu Industrial City Site Clearance, Earthworks and Minor Drainage Works Housing & Development Board
26. Site Clearance and Earthworks at Tampines N6 (Phase 2B) Earthworks and Minor Civil Works Housing & Development Board
27. Construction of Punggol Drive (Part 4) (Interim) Civil Works, Road and Drainage Works Housing & Development Board
28.
  1. Earthworks for Parts of Bidadari

  2. Drain Upgrading along Bartley Road between Upper Serangoon Road and Bartley MRT Station
Earthworks, Road and Drainage Works and Ancillary Works Housing & Development Board
29. Thomson Line Contract 205 – Construction of Woodlands South Station for Thomson Line Earthworks, Road and Drain Works Woh Hup (Pte) Ltd
30. Contract T226 – Construction of Marina Bay Station and Tunnels for Thomson Line Earthworks Taisei Corporation
31. Contract T3008 – Advances piling, Soil Improvement and Pile Extraction Works at Depo Earthworks GS Engineering & Construction Corp.
32. Managing Agent for Site(s) Management, Earthworks and Material Stockpiles at Tuas View Extension Earthworks, Operation and Maintenance of Stockpile Site JTC Corporation
33. Land Preparation Works for Airport Development Hoarding & Gate; Site Clearance and Tree Cutting; Surcharge and Earthworks Penta Ocean/Koon Joint Venture
34. Proposed Development of an Integrated Regional Hospital, a Community Hospital and Specialist Outpatient Clinics on Lot 02019N PT & Lot 02466A MK21 at Sengkang East Way/Sengkang East Road/Anchorvale Street, Singapore External Works Penta Ocean Construction Co. Ltd
35. Improvement Works to Surface Car Parks (Batch 70) Civil Works, Road and Drainage Works Housing & Development Board
36. Construction of Buangkok Drive (Extension) in Hougang Town (Part 1) and Construction of Bus Bay/Bus Shelter along Buangkok Crescent and Buangkok Link Earthworks, Road and Drainage Works and Ancillary Works Housing & Development Board